PERMITTEE MUST CONTACT DOT TRAFFIC & PLANNING OFFICE BY EMAIL AT. 8:30 AM to 4:30 PM, South Queens (south of the LIE) In addition, the streets serve as the access point for the subsurface infrastructure that provides water, sewer, power, and telecommunications services for the city. If all information is satisfactory the applicant is approved and the system auto-generates an email which is sent to the applicant with the EAN. Pedestrian RampsWhen a corner is constructed, reconstructed or repaired, pedestrian ramps must be installed in accordance with NYC DOT Standard Highway Specifications found and in accordance with the most recent revision of Drawing H-1011 from the NYC DOT's Standard Details of Construction. New York, NY 10013 Brooklyn, NY 11201 It also outlines principles for coordinating with NYC DOT when proposing excavation work to help make certain that excavation on streets occurs before or in conjunction with city street work, where practicable. 2 HOURS BEFORE UNTIL 2 HOURS AFTER ALL YANKEE HOME GAMES ALL MOVEMENTS INTO AND OUT OF THE SITE ARE RESTRICTED ALONG EXTERIOR STREET. All CGL insurance policies must contain the following cancellation clause: In the event of expiration or cancellation of any such policy, the company will give the Permit Office at least 30 days' written notice prior to such expiration or cancellation. 10 Richmond Terrace, Room 309 The applicant submits a completed Canopy Authorization Application, which must include the following: Written approval from the owner of the property to which the canopy will be attached. This is discussed in greater detail under Section 4.3 Street Restoration Requirements, and in theSections 2-11(e)(15), 2-11(e)(16) and 2-11(f) of the Highway Rules. VIOLATORS SHALL BE FINED AND PERMITS WILL BE SUSPENDED FOR NON COMPLIANCE. Notices of Violation (NOVs)/Summonsesare issued when there is a violation of laws, rules, regulations, specifications, or stipulations. THE EMBARGO INCLUDES BUILDING OPERATIONS. (5mb). Listed in the table are the most commonly requested Sidewalk Construction Permit types, which may be used when completing an application. The organization of the Street Works Manual generally follows the chronological process of planning and undertaking work in the street. (646) 892-1388/1389 Private homeowners applying for Sidewalk Repair Permits who will be making the repairs themselves may apply for permits by mail. When a need exists to develop special details similar to the standard details, consultants may request copies of the .dgn files from their NYSDOT Project Managers. Further information is available in Section 2-02 (h) of the Highway Rules. When utility company representatives mark a location, they use colored flags and/or paint to identify the type of underground service: Streets can hide a complex infrastructure of underground utilities. Fax: (718) 298-7075, Staten Island (part-time office) Canopy permits are not transferable from person to person or from the location of original issue. PERMITTEE MUST NOTIFY SCHOOL PRINCIPAL IN WRITING 48 HOURS PRIOR TO BEGINNING ANY WORK. The construction, alteration or repair of any building vault or transformer vault requires a permit from NYC DOT. 8FTRES-RESTORE AS PER SKETCH #1 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. 1 Centre Street, 9th Floor Attn: Forestry The guidance presented in the Street Works Manual does not supersede any existing federal, state or city laws, rules and regulations. During the final design stage of a city project, DDC will also hold a series of alignment meetings with the utilities and other agencies to inform them about proposed changes to the location of street infrastructure that would require facility relocation. Chapter 2 describes processes and tools to enhance advance planning and coordination of street work between NYC DOT's own capital resurfacing and reconstruction programs and the street infrastructure work of other stakeholders, especially those that perform a large number of street excavations. Plan Examination Unit ALL WORK TO MEET OR EXCEED NYC DOT STANDARDS. Utility companies, developers, contractors, and excavators who undertake any type of construction that will impact the street or occupy it with equipment, structures or other installations must obtain a permit. Brooklyn.Forestry@parks.nyc.gov NYC DOT may revoke or refuse to renew a permit for any of the reasons listed below. WORK SATURDAY, 8 AM-6 PM AND SUNDAY 9 AM-6 PM. 30-30 Thomson Avenue, 4th Floor Typically, a valid permit issued by the New York City Department of Buildings (DOB) is required prior to application for permits in this category. WORK SOUTHBOUND 9AM-6PM M-F AND 9AM-6PM SAT/SUN. PERMITTEE SHALL NOT DISRUPT OR DAMAGE SENSORS INSTALLED WITHIN THE PARKING_LN. The permittee must attach a copy of the original permit to the application when it is submitted for renewal and all applicable reviews and fees will apply. The goal of advance coordination is to reduce the number of excavations in New York City streets. POSTING OF SIGNS ON MTA/NYCT ANTENNA POLES IS PROHIBITED. Upon completion of updates, the holds will be released. These include major construction related projects or planned traffic enhancements (e.g., Second Avenue subway, bus rapid transit, water tunnel route), or where there are significant traffic issues (e.g., thru streets, exits and entrances to major tunnels and bridges). Download about 619 . Sidewalk flagsMust be 5'x 5' where feasibleAll flags containing substantial defects as defined in the Highway Rules must be replaced; patching of individual flags is not permitted. Applicants should contact the NYC DOT Plan Examination Unit (PEU) of the Permit Office to initiate the application process and to determine specific requirements for a permit and a license, if required. WORK 9 AM TO 7 PM SATURDAY AND 10 AM TO 7 PM SUNDAY. THE PERMITTEE MUST HAVE APPROVAL FROM NYCDOT STREET LIGHTING FOR INSTALLATION/REPLACEMENT OF POLES. Download a PDF of the Lighting chapter for offline access to the content in this section. USE OF NO STOPPING ZONES, NO STANDING ZONES AUTHORIZED PARKING, DIPLOMAT PARKING AND TAXI ZONES IS PROHIBITED. This Street Opening Permit retroactively covers the emergency street opening/excavation work already performed. A VMS BOARD MUST BE PLACED A MINIMUM OF 7 CALENDAR DAYS PRIOR TO CLOSURE WITHIN A LEGAL PARKING SPACE ENTERING THE STREET TO BE CLOSED. ALL UTILITY COMPANIES SHALL BE REQUIRED TO INSTALL THEIR UTILITIES &/OR CONDUITS A MINIMUM OF 18 INCHES BELOW THE ROAD WAY SURFACE OR BASE WHICHEVER IS GREATER AS PER NYC DOT HIGHWAY RULES & REGULATIONS 2-11(11)(VII). CONTRACTOR/PERMITTEE IS REQUIRED TO POST AND MAINTAIN ADVISORY SIGNS A MINIMUM OF48 HRS PRIOR TO CHANGING EXISTING PARKING REGULATION SIGNS TO APPROVED TEMPORARY CONSTRUCTION PARKING REGULATION SIGNS. Applicant should submit this form with the appropriate documentation and waiver request fee. All addresses must be the same on all above referenced documents. NO WORK EXCEPT FOR EMERGENCY WORK MAY OCCUR. Following are the steps for permit application, review and issuance at the central Permit Office: Applications for all other construction-related work, including work on critical streets in Staten Island, can be submitted to the borough office in the borough in which the work is to be performed. (212) 839-4700 WORK 11 PM TO 5 AM, MONDAY TO FRIDAY, MAINTAIN TWO 11 FOOT LANES FOR TRAFFIC, RESTORE FULL WIDTH WHEN SITE IS UNATTENDED. This category also covers installations above the street such as banners and decorative lights and permanent installations on the street such as bike racks. NYC Parks & Recreation Transformer vaults are typically installed, owned and maintained by an electric utility company. Chief Plan Review Section, DEP/BWSO (718) 595-5191, New York City Fire Department (FDNY) Work must begin within two hours after obtaining an Emergency Street Opening Permit Number and must be performed around the clock until the emergency is eliminated, unless otherwise directed by NYC DOT. If work is planned through the HE period, the critical reasons for the work must be included in the Work Description field of the application. 120-55 Queens Boulevard, 2nd floor The Department of Transportation (DOT) maintains and installs New York City parking regulation signs. PERMITTEE SHALL NOT MOVE, DAMAGE OR DISRUPT THE OPERATION OF THE STATION. Print his/her name and title and provide a signature. Executive (EXC) hold An EXC hold is automatically placed if the proposed permit locations involve locations deemed necessary by NYC DOT. Long Island City, NY 11101 APPLICANT SHALL NOT PLACE CONTAINER IN A WAY THAT CONFLICTS WITH OTHER PERMITTED CONSTRUCTION ACTIVITIES ON THE SAME BLOCK.PERMITTEE MAY BE REQUIRED TO REMOVE CONTAINER IMMEDIATELY UPON NOTIFICATION BY NYCDOT OR AUTHORIZED GOVERNMENT EMPLOYEE. The Permit Bureau issues a number of different categories of construction-related permits for work on a street. After repairs are complete, the property owner can contact 311 to schedule a Sidewalk Violation Dismissal. SIGNS MUST BE POSTED AT WORK ZONES AS WELL AS BOTH INTERSECTIONS OF AFFECTED SIDEWALK. Brooklyn Some of the requirements include but are not limited to: Expansion JointsExpansion joints must be placed at 20-foot intervals, expansion joint filler material must be placed to the full depth of the sidewalk, and all expansion joints must be recessed and sealed. Any emergency work on a street that involves a street opening/excavation requires a Street Opening Permit. Atransformer vaultis a subsurface structure or room that houses electrical transformers and appurtenant equipment. Street Arterial Maintenance (SAM) hold A Street Opening Permit request to perform work on a protected street will automatically have a SAM hold placed on it if the proposed work start date is within 18 months of the street being resurfaced/reconstructed. An explanation and description of "Holds" may be found in Section 3.5 Other Provisions Pertaining to Permits of this chapter. The location to which the application should be submitted depends on the location and type of construction-related work to be performed: Central Permit Office in ManhattanIn-person applications for non-emergency work, including work on all streets in Manhattan and on all critical streets in Brooklyn, Queens and the Bronx; all work to be performed for sewer and water system construction; and all capital project work, all utility work, all crane requests, and all full closures of sidewalks and roadways must be submitted only to the central Permit Office in Manhattan. Contact PEU for further information regarding the procedure to obtain initial and final approval for a transformer vault. While the situation is evolving, the agency remains committed to applying the principles and proven treatments included in the Street Design Manual to support the health and safety of all New Yorkers. The Office of Permit Management (Permit Office) provides extensive customer support for all applicants, registers permittees, receives and reviews for accuracy and completeness permit application submitted in person,and also reviews appropriate fees for both online and in-person applications. From a block party, which opens a single block to community activities for a day, to Summer Streets, which dedicates over 7 miles of streets to pedestrians, runners, and cyclists, programming reminds New Yorkers that streets are public space, and should support active, healthy, and sustainable lifestyles. Common examples include approval from the New York City Department of Parks and Recreation (Parks) if any street trees or tree pits will be affected by the proposed work; a permit from the New York City Department of Environmental Protection (DEP) if any water or sewer line will be affected; and a Certificate of Appropriateness from the New York City Landmarks Preservation Commission (LPC) if the proposed work is within an Historic District. Office Hours: MondayFriday from 9:00 AM to 5:00 PM, New York City Department of Environmental Protection (DEP) These holds can only be released by HIQA: Cobblestone (COB) hold All permits issued to work on a cobblestone street are automatically placed on hold until a HIQA inspector performs an inspection of the work site to establish existing conditions before work begins. Only one Emergency Street Opening Permit Number is required for a specific work location. It includes capital construction projects. SUCH SIGNS SHALL BE ORANGE,3'X3',DIAMOND SHAPE,WITH 4" BLACK LETTERING. ROADWAY MUST BE RESTORED IN KIND. Please note all fields marked with an asterisk (*) on application must be completed. Fax: 718-584-8628, Brooklyn Fax: (718) 858-0069, Manhattan THIS STIP IS USED FOR WORK THAT FALLS BETWEEN LANES AND REQUIRES THE CONTRACTOR TO RESTORE THE ROADWAY FROM 1' PAST THEIR RESTORATION TO THE NEAREST CURB FOR THE LENGTH OF THEIR WORK. ONE ADDITIONAL LANE ADJACENT TO THE ENCLOSED WORK ZONE MAY OCCUR 12:01 AM - 5 AM NIGHTLY WITH NO NOISE OPERATIONS. A permit is required to place any construction trailer or similar structure in the street. Under the surface, the same streets support the city's water, sewer, power and telecommunications infrastructure, as well as its subway tunnels and building vaults. The applicant will be able to pick up the permit from the Permit Office in the borough in which the canopy is located upon payment of the appropriate fee. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. New York City Department of Transportation The pedestal is monolithically poured with the foundation. City streets facilitate the movement of pedestrians, transit riders, motorists and cyclists as well as the delivery of goods and services throughout the city. RESTORE ALL TRAVEL LANES WHEN SITE IS UNATTENDED CONTRACTOR MAY CONTAIN A MAXIMUM OF 25 LINEAR FEET, 8 FEET ADJACENT TO THE CURB DURING NON-WORK HOURS. All public and private actions must comply with all applicable laws, rules, and regulations, not solely those listed below. Customer Service: (718) 579-6920, Brooklyn Advance notice and coordination of planned street work is one of the most effective tools for reducing the number of street excavations on newly resurfaced or reconstructed streets. CONTRACTORS WHO AT ANY TIME DURING THEIR PERMITTED WORK ENCOUNTER TRAFFIC SURVEILLANCE CAMERAS, DETECTION EQUIP OR ANY TYPE OF COMMUNICATION EQUIPMENT (WIRELESS OR HARD-WIRED) ON ANY NYCDOT FACILITY, THAT IS NOT INCLUDED ON THE DESIGN/BUILD DWGS, SHALL IMMEDIATELY NOTIFY NYCDOT TRAFFIC MANAGEMENT AT. West or Tax I.D. AN EMBARGO WILL BE IN EFFECT FOR THIS WORK AREA FROM 7/28/14 THRU 8/16/14 ALL ROADWAY/SIDEWALK OPENINGS WHICH CANNOT BE COMPLETED INCLUDING BACKFILL AND RESTORATION PRIOR TO 7/28/14 SHOULD NOT BE STARTED. BUG Ratings DOT Street Lighting evaluates LED luminaires using the IES BUG (Backlight, Uplight, and Glare) rating system as part of its specifications. The New York City Department of Transportation (NYC DOT) has adopted specifications and regulations stipulating how street work must be performed in order to minimize disruption and maintain the integrity of the street surface. Building Operations/Construction Activity Permits are designated as the "02" permit series, meaning all permits in this category begin with "02".
This chapter describes the different types of permits that are issued by the New York City Department of Transportation (NYC DOT), the one-time permittee registration process, the application procedure for each permit type, and special circumstances and procedures. Section 8: SIGNATURE OF LEGAL ENTITY OFFICER (THIS INDIVIDUALS NAME WILL APPEAR ON ALL DOT PERMITS). The maximum transverse slope permitted for vault covers, gratings and other sidewalk structures is 1" in 5'. If applicable, a permit from the Landmarks Preservation Commission (LPC) for the placement of a canopy in ahistoric district or attached to a landmarked building. IF WORK IMPACTS THE STATION, THE PERMITTEE MUST CONTACT NYC BIKE SHARE AT 855-245-3311 FOR THEIR REQUIREMENTS PRIOR TO WORK. Permits are available for various types of work, including Street Opening Permits, Building Operations/Construction Activity Permits, and Sidewalk Construction Permits. At crossings, the height of Accessible Pedestrian Signals must be reachable by a person using a mobility device, at a preferred height of 42 inches and a maximum height of 48 inches (see 2010 ADA Standards for Accessible Design).
Glossary | Street Works Manual WORK ALLOWED 7 PM TO 6 AM NIGHTLY. HIQA inspects work sites for compliance with Title 19 of the NYC Administrative Code, NYC DOT Rules and Regulations, NYC DOT specifications and NYC DOT permit stipulations. A Sidewalk Violation will be removed if the work has been satisfactorily completed. AND THAT THE PREVAILING SCALE OF UNION WAGES SHALL BE THE PREVAILING WAGE FOR SIMILAR TITLES AS ESTABLISHED BY THE FISCAL OFFICER PURSUANT TO SEC. WORK HOURS ARE EASTBOUND 7 AM TO 3 PM OR WESTBOUND 10 AM TO 4 PM, MONDAY THROUGH FRIDAY, WORK MONDAY TO FRIDAY 10 AM-4 PM, SATURDAYAND SUNDAY, WITH NO NOISY OPERATIONS AFTER MIDNIGHT. 3. One Fordham Plaza, 5th Fl. Street lights and signals at corners must be sited so that they do not obstruct pedestrian ramps, ensuring sufficient access to the sidewalk for all pedestrians, including those using mobility devices. New York, NY 10041 Staten Island, NY 10301 REQUIRES LOWER MANHATTAN BOROUGH COMMISSIONER'S OFFICE (LMBCO) REVIEW. POSITIONING OF TRAFFIC SIGNS (TOTAL OF . 42 Broadway See the state links below for available standard drawings. Tel: (718) 298-7300 Its overall goals are both far-reaching and vital: sustaining the city's investment in its streets, enhancing access to subsurface infrastructure and minimizing transportation and community disruptions. TO FRI. AND 9AM TO 11 PM SAT. See, Sidewalks must conform to ADA requirements for a minimum clear-path width and provision of spaces where wheelchair users can pass one another or turn around, Provide an unobstructed clear path of 8 feet or one half the sidewalk width (whichever is greater) in commercial, high-density residential, and transit-adjacent areas, Sidewalks in low-rise residential areas should be at least 5 feet wide, Wherever possible, sidewalk cross-slope should not be greater than 2%, Sidewalks must meet load-bearing, friction, and other requirements per relevant standard specifications and regulations, Color of detectable warning strips on pedestrian ramps should contrast with surrounding pavement: red for, The area within 18 inches of the curb should be kept free of all obstructions, New York City Mayors Executive Order No.22 of 1995 (the Clear Corner Policy) states that to the maximum extent possible, structures and objects should not be placed in the corner quadrant, For recommended clearances between obstructions, see, Include planted areas and stormwater source controls within sidewalks wherever possible when a maintenance partner is identified, If work includes tree planting, consider the location of utility infrastructure, including DEP sewers and water mains, Maximize trees and other green cover wherever clearance allows. IT IS THE PERMITTEE'S RESPONSIBILITY TO COORDINATE WITH DDC'S WALL STREET WATER MAIN PROJECT EIC AT (212)791-8170 PRIOR TO BEGINNING A WORK OPERATION. (212) 442-1890 Bronx, NY 10458-5891 VARIANCE GRANTED TO WORK DURING THE"HOLIDAY" EMBARGO-NOVEMBER TO JANUARY, AS STIPULATED BY THE OCMC OFFICE. PEU also accepts applications to abandon existing vaults that are no longer in use.
Fax: (718) 816-9194 THE CONTRACTOR SHALL MAINTAIN (1) EITHER A 5-FOOT CLEAR SIDEWALK FOR PEDESTRIAN ACCESS AT ALL TIMES,(2) A PROTECTED WALKWAY IN THE ROADWAY MEETING ALL NYCDOT SPECIFICATIONS AND RAMPED AT ENTRY TO SIDEWALK FOR HANDICAPPED ACCESSIBILITY OR,(3) A NYCDOB APPROVED PROTECTED WALKWAY THORUGH THE BUILDING. WORK HOURS ARE NORTHBOUND 7 AM TO 3 PM OR SOUTHBOUND 10 AM TO 4 PM, MONDAY THROUGH FRIDAY, WORK HOURS ARE NORTHBOUND 10 AM TO 4 PM OR SOUTHBOUND 7 AM TO 3 PM, MONDAY THROUGH FRIDAY, WORK HOURS NORTHBOUND 7 AM TO 3 PM OR SOUTHBOUND 10 AM TO 6 PM, MONDAY THROUGH FRIDAY, WORK HOURS ARE NORTHBOUND 10 AM TO 6 PM OR SOUTHBOUND 7 AM TO 3 PM, MONDAY THROUGH FRIDAY, WORK HOURS ARE EASTBOUND 10 AM TO 4 PM OR WESTBOUND 7 AM TO 3 PM, MONDAY THROUGH FRIDAY, WORK HOURS ARE EASTBOUND 7 AM TO 3 PM OR WESTBOUND 10 AM TO 6 PM, MONDAY THROUGH FRIDAY, THIS PERMIT IS VOID IF INSURANCE IS NOT RENEWED TO COVER PERIOD OF THIS PERMIT, WORK HOURS ARE EASTBOUND 10 AM TO 6 PM OR WESTBOUND 7 AM TO 3 PM, MONDAY THROUGH FRIDAY, THE PERMITTEE IS REQUIRED TO INSTALL, MAINTAIN, AND REMOVE ALL NECESSARY TEMPORARY PARKING AND REGULATORY SIGNS AND PAVEMENT MARKINGS AND RESTORE TO THEIR ORIGINAL CONDITION PER NYCDOT STANDARDS PRIOR TO THE EXPIRATION OF THE PERMIT. RESTORATION OF ROADWAY WHICH HAS GREEN COLORED BIKE LANE MARKING MUST BE RESTORED AS FOLLOWS: FOUR COATS OF GREEN # 105953 RIDE-A-WAY COATING MATER'L MFG'D BY FLINT TRADING INC OR EQUIVALENT. For questions, Mon-Fri 8:30 AM until 5:00 PM. (212) 839-2387/88/89
These applications can be submitted online using NYCStreets. ONE 11 FOOT LANE MAY REMAIN CLOSED FOR CONCRETE CURING ONLY FOR MAXIMUM OF48 HOURS. Following are the specific steps for canopy authorizations and permits: A permit must be obtained to install the canopy at the approved location (Erect Canopy Permit from the "01" Street Opening Permit series).
619 Maintenance and Protection of Traffic - New York State Department TO FRI. PRIOR TO BEGINING ANY WORK, TO ENSURE THAT YOU RESTORE THE AREA IN-KIND, YOU MUST CONTACT THE NYCDOT RED LIGHT CAMERA UNIT TO OBTAIN THE CONSTRUCTION AND MARKINGS PLANS FOR THIS WORK AREA. 1932 Arthur Avenue, 5th Floor The list of protected streets is updated daily and is accurate as of the previous business day. If the request is approved or modified, then all conditions, restrictions, fees and application procedures for obtaining a construction-related permit apply. **DOT's lighting division generally classifies cross streets as local roadways*DOT's lighting division generally classifies avenues and boulevards as collector roadways. Permeable Interlocking Concrete Paver (PICP). In order to apply for an embargo waiver, a Request for Roadway/Sidewalk Permits during Embargo Periods form must be submitted for review and consideration to the Permit Office. New York, NY 10007 These are in addition to the "Common Requirements" listed at the beginning of this section. MAINTAIN 2 LANES NORTHBOUND AND 1 LANE SOUTHBOUND FROM 4PM-6PM M-F. It is important that contractors and utility companies are responsible partners as well in order for coordination to be effective. Upon completion of work, sidewalks must be restored according to Highway Rules, Section 2-09(f)(4) and NYC DOT Standard Highway Specifications.
Manuals and Standards | Ohio Department of Transportation Emergency work will not be placed on hold and shall proceed in accordance with Highway Rules, Section 2-11 (g). 1150 Clove Rd. 40 Worth Street 8th Floor NYC DOT inspects sidewalks for defects and when a defect is identified, a Sidewalk Violation is issued to the property owner and a copy is submitted to the County Clerk's office. POST SIGNS MEETING NYCDOT SPECS AT WORK ZONE AND AT BOTH INTERSECTIONS DIRECTING PEDS TO OPPOSITE SIDEWALK. The permittee must attach a copy of the original permit to the application when requesting a re-issuance and all applicable reviews and fees will apply. This New York 811 marking shows where a cable television line is located beneath the sidewalk. WORK BEING PERFORMED IS FOR EMERGENCY SIDEWALK REPAIRS DUE TO TORNADOS.
Drawings - New York State Department of Transportation This list is provided as a reference tool, for informational purposes only, and is not an exhaustive list. Kew Gardens, NY 11424 MAINTAIN 1 - 11 FOOT LANE FOR 2 WAY THRU TRAFFIC W/FLAGGERS AT EACH END OF WORK ZONE. LANE CLOSURES MAY NOT OCCUR WHEN TWO LANE CLOSURES OCCUR ON GOWANUS OR ON RAMPS LEADING TO 3RD AVENUE. Applicants have two options to acquire an EAN. New York, NY 10007 After the canopy passes final inspection, HIQA will release the hold and the applicant must return to the Permit Office to obtain the permit to maintain the canopy. Office hours: 8:30 AM-5:00 PM, Queens Fax: (212) 788-3086, New York State Department of Environmental Conservation (DEC) Download about 619-011: Work Zone Traffic Control General Tables & Legend; General Information 619-012: Sign Table Keywords: Sign, Table. 24 West 61st St., 5th Fl. WORK CROSSING THE ROADWAY CAN NOT EXTEND MORE THAN 11 FEET AT A TIME. Department of Transportation
280 Broadway, 3rd Floor Office hours: 8:30 AM-3:30 PM. WALKWAY MUST BE RAMPED AT ENTRY TO SIDEWALK FOR HANDICAPPED ACCESSIBILITY. It could be because it is not supported, or that JavaScript is intentionally disabled. SPEED REDUCERS ARE PROPOSED FOR THE ROADWAY OF YOR WORK AREA. Office hours: 8:30 AM-4:30 PM. Failure to comply with an order issued by the Commissioner may result in criminal or civil penalties. The Guarantee Period is considered to be three years on unprotected streets, and up to five years, but at no time less than three years, on protected (recently resurfaced or reconstructed) streets commencing on the restoration completion date. See Section 3.4 Canopy Authorization and Permits for more information. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Additionally, High Density Polyethylene (HDPE) conduit, a more cost-effective material that is not susceptible to corrosion from residual salt water after storm surge events, is replacing galvanized steel for all signal locations and street light locations in flood-vulnerable areas. One call to New York 811 provides for where gas (yellow), electric (red) and phone (orange) are located. Any corrective action required by the CAR must be performed within 30 daysof the issuance of the CAR. THIS STIP VOIDS ANY/ALL OTHER CONFLICTING STIPS ON THIS PERMIT UNLESS ACCOMPANIED WITH VARIANCE STIP VAR001. Send corrections and additions to the Standard Drawings team. Prior to submitting a Street Opening Permit application, the Protected Streets Listing should be consulted in order to determine if the proposed work location is in protected status. MUST CONTACT NYSDOT ENGINEER IN CHARGE NIGHTLY TO COORDINATE. NYC DOT also routinely meets with utility companies and others who perform street excavations to inform these organizations of upcoming events and major construction projects with which NYC DOT is involved. Check all types of work that will be performed by the applicant or his/her corporation. THIS PERMIT ONLY ALLOWS FOR THE CLOSURE OF A ROADWAY OR SIDEWALK AS STIPULATED. Access the, If the applicant intends to fully close a roadway, a. Vault (VLT) hold A VLT hold is automatically placed if the proposed permit work is for the installation or repair of a vault, which must be reviewed and released by the Permit Office. New York State law (Article 36 of General Business Law and 16 NYCRR Part 753, AKA Industrial Code 53) requires excavators to contact New York 811, via 811, 800-272-4480 or the internet, within 2 to 10 working days before performing any digging or excavation work. IF WORK IS MORE THAN 100FT AWAY, YOU MUST FORWARD CERTIFICATION. All applications for construction or repair of a transformer vault must be accompanied by an electric utility company layout, and must comply with the minimum clearance requirements for transformer vaults unless an approval or waiver is obtained from the appropriate agency or utility (more information is available inAppendix B, Forms). WHEN APPLICABLE, NYCT OR PRIVATE BUS COMPANIES MUST ALSO BE NOTIFIED. New York, NY 10038
4.0 Executing Work in the Street - Streetworksmanual.nyc Additional requirements are contained in Sections 2-02 and 2-09 of the Highway Rulesand should be consulted before any work is performed on the street. Links were last checked January 2023. Street Opening Permits are generally taken out by entities that need access to subsurface infrastructure, including utility companies and contractors, such as licensed master plumbers. Listed on the following page are the most commonly requested Street Opening Permit types which may be used when completing an application. Commercial Refuse Container Carting Companies*: You must enter your Business Integrity Commission (BIC) License or Registration number. See Section 3.5.1 Holds for more information. 8:30 AM to 4:30 PM, Brooklyn Tel: (718) 482-4516 See, Utilize recycled content in paving materials. APPROVAL FROM THE LANDMARK PRESERVATION COMMISSION IS REQUIRED BEFORE WORK COMMENCES.